
|








43 Kirk Road, Carluke,
South Lanarkshire.
ML8 5BN
( +44 (0)1555
771165
Ê +44 (0)1555
771165
|
Certification |
|
Our highly experienced site based staff are Graded S.J.I.B Approved, and
C.S.C.S Assessed.
Through our
employee development program, all Senior Cable Jointers have been fully
trained and assessed to carry out our works. In addition to this, all
Senior status jointers are qualified and certified to install the
following leading manufacturers/brands of equipment.
Note. All H.V. cable jointing teams are headed by a Senior Cable
Jointer.
|
|
 |
Scottish Power 11kV Cable Jointing
Certification Covering
Raychem, 3M, Pirelli, WT Henley, and Compound Filled Conventional
type of Straight joints, Breech joints, Loop joints, Pot Ends, and all
Cable End Terminations.
Scottish Power Polymeric Cable Certification
Covering 3M Cold Shrink Joints, End Terminations, Trifurcating Joints,
Transition Joints, and Single core End Terminations.
|
|
 |
Approved Termination installer
up to and including
52kV. |
|

|
Approved installers of Elastimold/Euromold Separable Connector
Systems.
Approved installers of
36CSSM-3 Coldshrink Cable Joints.
|
|
 |
Approved installers of 11kV Joints and Terminations.
Approved installers of 33kV QS2000 Joint Kit 94-AP631-1. |
 |
Approved installers of 11kV Joints and Terminations. |
|

HV Testing |
Fully
trained and experienced in the setting up and operation of H.V. DC test
Equipment.
Fully trained and experienced in principals of Sheath Fault Location
using Pool of Potential method. Our engineers can accurately pin point
underground cable sheath faults to within one metre, and often less.
Non-intrusive
oil testing of Transformers to determine the Transformer condition, and
Oil PCB content.
|
|

Authorised
Person |
As a market
leader in H.V. electrical switchgear, we have staff who have been
trained by Schneider, met the requirements, and are experienced in H.V.
switching and Authorised Person duties. We can take ownership of a
clients network and issue all statutory documentation to allow works to
commence on a system. |
|
 |
The company has met
the requirements and is an Approved Sub-Contractor to Balfour Kilpatrick.
|
|
 |
The
company has met the requirements and is an Approved Sub-Contractor to
B.P. |
|
 |
The
company has met the requirements and is an Approved Sub-Contractor to
Balfour Beatty. |
|
 |
The
company has met the requirements and is an Approved Vendor to CE
Electrics H.V. Distribution Networks. |
|
 |
The company has met
the requirements and is an Approved Sub-Contractor to Alfred McAlpine. |
|
 |
The company has met
the requirements and is an Approved Sub-Contractor to Southern Electric
Contracting.
|
|
 |
The
company has met the requirements and is an Approved Sub-Contractor to
Watson Norie Electrical and Instrumentation Engineers. |
 |
Approved installers of 11kV M.I.R.P Cable joints.
|
|
|
|